Street Name and Location |
Town |
Description of Works |
Diversion/Traffic Management Arrangements |
Duration |
|
Purston Lane
from its junction with Pontefract Road for a distance of approx. 175 metres. |
Ackworth |
Gas works |
Purston Lane, Ackworth Road, Went Lane, Cross Hands Lane, Wakefield Road, Barnsley Road, Pontefract Road and vice versa. |
Works commence on 22/11/2008 until 26/11/2008 |
|
Holywell Lane
at the junction with Fryston Road |
Castleford |
Junction improvement scheme |
Controlled via 2 Way lights as required |
Works commence on 17/11/2008 until 24/12/2008 |
|
Royd Moor Lane –
close to rail bridge |
Hemsworth |
Access to and from temporary haul road for the new Hemsworth A1 link |
Controlled via 2 Way lights as required |
Ongoing works until 29/03/2009 |
|
Church Lane
from Wakefield Road to Dalefield Road |
Normanton |
Carriaegway planning and resurfacing |
Controlled via 2 Way lights as required |
Works commence on 18/11/2008 until 24/11/2008 |
|
Havertop Lane –
at the Havertop Lane / Loscoe Lane roundabout |
Normanton |
Remodelling of roundabout |
Speed restriction and lane closures in place |
Ongoing works until 19/12/2008 |
|
Doncaster Road –
between Dale Lane roundabout and north of Upton roundabout |
North Elmsall |
Verge works to accommodate Hemsworth - A1 Link Road construction |
Controlled via 2 Way lights as required |
Ongoing works until 30/11/2008 |
|
Halfpenny Lane
along length of Halfpenny Lane |
Pontefract |
Traffic calming to include speed tables, cushions, signing & lining. |
Controlled via 2 Way lights as required |
Works commence on 01/11/2008 until 30/11/2008 |
|
Slutwell Lane –
from Friarwood Lane Junction to Southgate Junction |
Pontefract |
Reconstruct a boundary wall to the new Pontefract Hospital site and widen footpath on Slutwell Lane |
Road closure in place –
diversion signed on site –
Slutwell Lane, Southgate and Friarwood Lane |
Ongoing works until 23/01/2009 |
|
Barnsley Road
between junctions with Brookside Street and Westfield Lane. |
South Elmsall |
Christmas Lights Switch On |
Diversion signed on site |
Works commence on 19/11/2008 until 19/11/2008 |
|
Ferry Lane –
from junction with Birkwood Road (on bridge over canal) to outside number 128 Ferry Lane |
Stanley |
Scrape and line the water main |
Controlled via 2 Way lights as required |
Ongoing works until 28/11/2008 |
|
Back Lane |
Upton |
Construction of new Hemsworth - A1 Link Road |
Road closure in place –
diversion signed on site –
Back Lane, Minsthorpe Lane, Dale Lane, A638 - Doncaster Road and vice versa |
Ongoing works until 14/04/2009 |
|
Wrangbrook Lane |
Upton |
Construction of the new Hemsworth / A1 Link Road |
Road closure in place –
diversion signed on site –
Wrangbrook Lane, A1 - Barnsdale Bar junction, A1 travelling South to Redhouse junction 38, Doncaster Road and vice versa. |
Ongoing works until 01/12/2008 |
|
Agbrigg Road –
from railway bridge to approx. junction with Maybush Road |
Wakefield |
Gas works |
Controlled via 2 Way lights as required |
Ongoing works until 01/12/2008 |
|
Bull Ring |
Wakefield |
Major Project to realign the Springs and crossroads area and to declutter the "street scene" |
|
Works commence on 01/05/2008 until 01/05/2009 |
|
Cliff Lane –
full length |
Wakefield |
Formation of Site Access |
Road closure in place –
diversion signed on site –
Cliff Parade and Burton Street in a northerly direction and Bell Street, Bond Street and Cliff Parade in a southerly direction. |
Ongoing works until 31/01/2010 |
|
Eastmoor Road
from junction with Pinderfields Road to junction with Stanley Road. |
Wakefield |
Traffic scheme - introduce permit holder only parking, limited waiting and no waiting. |
|
Works commence on 01/09/2008 until 30/12/2008 |
|
Jacobs Well Lane –
at junction with Union Street and Jacobs Well Lane |
Wakefield |
Major highway realignment |
Banned right turn into and out of Union Street –
diversion signed on site –
Marsh Way northbound, Northgate roundabout and Marsh Way southbound |
Ongoing works until 19/12/2008 |
|
M1 junction –
at junction 41
|
Wakefield |
Signalisation of the motorway junction & slip road resurfacing |
Traffic management on the approaches too and on the roundabout at junction 41 |
Ongoing works until 31/01/2009 from 8pm until 6am only |
|
Thornes Lane –
section of Thornes Lane between Ings Road and Kirkgate |
Wakefield |
Works to construct a footbridge which will cross the River Calder to the new Hepworth Gallery. |
Banned right turn out of Thornes Lane onto Ings Road –
diversion signed on site –
Thornes Lane, Ings Road, Denby Dale Road roundabout and Ings Road. |
Ongoing works until 31/12/2008 |
|
Shay Lane
between Shay Lane, via Crofton cricket pitch to Hare Park Lane |
Walton |
Creation of a cycle track |
Controlled via 2 Way lights as required |
Works commence on 01/10/2008 until 31/12/2008 |